Home » Application » Waterproof Solutions for Industrial Buildings

Waterproof Solutions for Industrial Buildings

Industrial building waterproofing focuses more on durability, resistance to harsh environments, handling complex structural deformations, and dynamic loads.
Osea Guard Industrial Building Waterproofing System provides a complete solution for building waterproofing, which can meet the waterproofing requirements of many parts of buildings such as basements, walls, floors, walls, roofs, etc., ensuring that the building structure and internal space are not contaminated, and providing people with a comfortable and safe living space environment.

Application Scenario:
Rooftop, garage, basement, etc.

Material Selection

Prioritize Performance and Have Strong Targeting

Metal Roof Waterproofing

Priority should be given to selecting high-quality overall waterproofing systems, including highly weather resistant sealants (such as silicone and MS glue), butyl rubber waterproof tape, and professional metal roof waterproofing coatings (such as high elasticity acrylic and polyurethane coatings).

​​​​​​​Underground Waterproofing

High polymer self-adhesive membrane waterproofing rolls (PVC/TPO/SBS) that are resistant to water pressure and corrosion or reactive bonding rolls can be selected, which can achieve full adhesion with concrete structures and form a rigid flexible bond.
 

The Waterproofing Membrane You May Need

Precautions During the Construction Process Stage

Grassroots Treatment Must Meet the Standards

The strength, flatness, and cleanliness (free from oil stains and floating dust) of the base layer are the basis for ensuring effective bonding of the waterproof layer. For metal roofs, thorough rust removal is necessary.
All corners, pipe roots, etc. should be made into rounded corners to facilitate the construction of waterproof layers.:

Detail Node Enhancement Processing ("One Cloth, Three Coatings" Or Similar Process)

At all critical areas such as joints, screw heads, cracks, and pipe roots, apply a base coat first, then lay reinforced polyester cloth (or non-woven fabric), and finally apply a cover coat on top. This is the core process to ensure that the waterproof system does not crack in dynamic environments.

Key Points for Metal Roof Construction

Fasteners: Self tapping screws with high-quality EPDM waterproof washers must be used, and the tightening force must be moderate to allow the washers to fully deform and seal without excessive compression.
 
Board lap joint: The interlocking connection of the vertical edge should be in place; The sealant or strip used for joint construction should be continuous and full.
Installation of penetrating parts: Waterproof gaskets must be used under the base, and after installation, the surrounding areas should be fully sealed with sealant, and a flashing plate should be installed.

Finished Product Protection Is Crucial

After the construction of the waterproof layer, it is strictly prohibited to walk, stack heavy objects or perform welding operations on it at will to avoid damage. During subsequent backfilling, it is necessary to avoid direct impact of soil materials containing sharp stones on the waterproof layer.

Our Success Stories

Telephone

+86-18665096343 (Leaha Ji)
​Copyright © OSEAQUARD All Rights Reserved.

Navigation

Products

Application

Subscribe to our newsletter

Promotions, new products and sales. Directly to your inbox.